VANCOUVER, British Columbia, Feb. 08, 2021 (GLOBE NEWSWIRE) -- Standard Uranium Ltd. (“Standard Uranium” or the “Company”) (TSX-V:STND) (OTCQB:STTDF) (Frankfurt:FWB:9SU) is pleased to announce the Phase II winter drill program at its flagship 25,886-hectare Davidson River Uranium Project (the “Project”) has begun. The winter program will consist of approximately 4,500 m of diamond drilling in 9 holes. The Project is located in the Southwest Athabasca Uranium District of Saskatchewan 25 km to 30 km to the west of Fission Uranium’s Triple R and NexGen’s Arrow deposits and encapsulates the Warrior corridor which is inferred to be the continuation of the Patterson Lake corridor. Full details of the Phase II drill program are available in the previously announced news release on December 29, 2020.